The argument · what is scarce

The bottleneck doesn't sit still. It migrates.

Making an AI model takes electricity, buildings, chips, memory, data, skilled people and money, all at the same time. Whichever of them is hardest to get sets the pace for the rest and collects most of the profit, until the industry builds its way out of the shortage. Then the shortage turns up somewhere else. This essay sets out why that happens, where the shortage has sat so far, and how this site tries to tell where it sits now.

Folio I · the rule

When every part is needed, the scarcest one gets paid

A factory line runs at the speed of its slowest station. Eliyahu Goldratt, an Israeli physicist who became a management writer, built a theory on that observation in The Goal, a novel about a failing factory that he wrote with Jeff Cox in 1984. A system, he argued, does only as well as its constraint allows, the constraint being whatever most limits it. Speeding up anything else is wasted effort. His method also ends on a warning: relieve the constraint and another one will limit the system instead, so go back to the first step and look again. This essay calls that constraint the bottleneck: the one input that is hardest to get, which sets the pace for everything else.

Who gets paid is an older question. David Ricardo, an English economist, asked in 1817 why landlords grew rich when bread grew dear. It can look as if high rents make corn expensive. Ricardo argued that it ran the other way: "Corn is not high because a rent is paid, but a rent is paid because corn is high." Good land is limited, so when people want more corn the extra money ends up with whoever owns the good land, and the owner need do nothing to earn it. Economists still use the word rent for income that comes from owning something scarce, as opposed to income from effort. Ricardo was writing about farms. Read a little more widely, his point is that the payment goes to whatever cannot quickly be made more of.

Put the two together and you have a rule for an industry in which every part is needed at once. The bottleneck sets the pace, and the owner of the bottleneck collects the rent. The first essay on this site met the same idea from the other side, through David Teece, a business economist who studied why inventors so often watch someone else profit from their inventions: the money settles with whoever owns what the invention cannot do without. In AI the clearest case is NVIDIA, the largest designer of AI chips, which keeps 75.0% of its sales as gross profit, meaning what is left after the cost of making the chips. That is what a bottleneck looks like in a company's accounts.

A margin like that is also an invitation. Every buyer who pays it has a reason to find a way around it, every rival has a reason to build a substitute, and every supplier has a reason to expand. So the rent is temporary by construction. The interesting question is never only who holds the bottleneck today. It is where the shortage goes once this one is relieved.

The scarcest input sets the pace and its owner collects the rent, until it is relievedA model, not a measurement
The scarcest input sets the pace
rent
the pace

Every input is needed at once, so the industry can go only as fast as the one it has least of. Whoever owns that input collects the rent. More of anything else adds nothing.

Buyers find a way around it, rivals build a substitute, suppliers expand.
Relieve it, and the shortage turns up somewhere else
rent
the pace

The industry builds its way out and the pace rises, but only as far as the next scarcest input. The rent moves there with it.

the bottleneck: the input there is least ofwhat the industry can use of each inputspare: more of it adds nothingthe pacewhere the old bottleneck stood

A drawing of the rule this folio sets out, not a measurement. The heights are a drawing choice and carry no figures, and the inputs drawn tall are not claimed to be plentiful. Chips and memory are named only to show a move of the kind the next folio records around 2023 and 2024. The real record is untidier: shortages overlapped, chips stayed short after memory ran short, and neither panel shows today. Rent is income from owning something scarce, and it goes to the input's owner. Where this site tries to read the real thing is the scorecard further down.

Folio II · the record

It has already moved more than once, and never in single file

It started with people. In 2012 a neural network, a program loosely modelled on connected brain cells that learns from examples, won a well-known image-recognition contest far ahead of the runner-up. It was built at the University of Toronto by Alex Krizhevsky, Ilya Sutskever and their adviser Geoffrey Hinton, and it turned research in computer vision toward neural networks. What ran short was people who could build them. In 2013 Google bought Hinton's company, taking on Hinton and several of his students, and in 2014 it bought the AI company DeepMind, a deal that MIT Technology Review described as a purchase of people, not products. Yoshua Bengio, an AI researcher at the University of Montreal, estimated that year that only about fifty such experts existed in the world, many of them still graduate students.

Then computing power. In January 2020 researchers at OpenAI, one of the labs, as the companies that train the largest AI models are called, posted a paper called "Scaling Laws for Neural Language Models". It found that a language model, a program trained on text to predict what comes next, improves smoothly and predictably as its size, its training text and the computing power spent on it are scaled up together. A result like that is a reason to keep buying computing power. By 2023 buyers wanted more of it than could be made. NVIDIA's sales to data centres more than tripled in the financial year that ended in January 2024. Notice where the shortage went next. TSMC, the Taiwanese firm that manufactures those chips, said in 2023 that making the chips themselves was no problem; what was very tight was its capacity for advanced packaging, the step that joins a processor to its memory. In May 2024 SK Hynix, the leading maker of the fast stacked memory that AI chips use, said its supply was sold out for that year and almost sold out for the next.

Text looked like running short at about the same time. In 2022 researchers at DeepMind found that large language models were "significantly undertrained", meaning they had been given too little text for their size. The same year researchers at Epoch AI, a research nonprofit that publishes estimates of the data, chips, computing power and buildings behind AI, estimated that the stock of high-quality language data would be exhausted "likely before 2026". In 2024 the same group revised that: it might not happen until 2028. The labs did not wait to find out. When scraped text stops being enough, labs pay people to write better text. A 2022 paper from OpenAI trained a model on demonstrations and rankings from about forty hired contractors, and the people hired to judge the results preferred the answers of a small model trained that way to those of a model more than a hundred times its size. By the middle of 2023 Scale AI, a firm that sells such work, was advertising for trainers with expertise in law, finance and programming. In 2025 Meta took a minority stake in Scale AI, which Meta's audited accounts carry at $13.8B. Surge AI, a rival, was reported in 2025 to have passed $1.0B in yearly revenue without having raised any outside money.

Using the models was expensive for a while, and then the price fell fast. Epoch AI reported in March 2025 that the price of reaching a fixed level of performance had been falling by between nine and nine hundred times a year, depending on the task. That is the price a provider charges, not what the model costs the provider to run, and Epoch warned that the fastest falls might not last. OpenRouter, a marketplace that gives developers one way in to hundreds of models and can route each request among them, says it started in early 2023; in August 2026 the payments company Stripe agreed to buy it. A router earns its keep while models differ widely in price and quality. The better it works, the more easily buyers move to the cheapest model that is good enough, the harder sellers must compete on price, and the less anyone needs a router.

Electricity is told last here because it may stay longest, not because it arrived last. In July 2022 Dominion Energy, a utility in Virginia, began telling data-centre companies that power for some new sites in Loudoun County would be delayed for years. In 2024 the United States Department of Energy told Congress that waits of three years were commonly quoted for a large power transformer, the substation equipment that steps voltage up for long-distance lines and down again for the sites that use the power, where under a year had been normal before the pandemic. In April 2025 the International Energy Agency projected that the electricity used by data centres would more than double by 2030.

None of this happened in single file. Computing power and data were short at the same time, and power arrived while both still were. The chart shows the overlaps. Its spans are this site's reading of the events above, not a measurement, and each one has its reason and its source in the table beneath it.

Where the bottleneck has sat, year by yearthis site's reading of dated events, not a measurement
the bottleneckshort, but not the bottleneckthis site's prediction

Hatched means a prediction, listed at the end of this page with its test or the outcome that would prove it wrong. The right edge is the end of the chart, not a date.

Every span, with its reason
InputYearsReadingWhy
People who could build it2012–2017the bottleneckFrom the 2012 contest win to the years when Google bought a research team for its people; a researcher then put the world's experts at about fifty. That people were what held the field back is this site's reading, and the end year is a judgement: no single event marks it. source
AI chips2020–2023shortIn January 2020 researchers at OpenAI found that a language model improves predictably as its size, its training text and the computing power spent on it are scaled up together, which gave every lab a reason to want more chips. The paper says nothing about chip supply; reading these years as short is a judgement. source
AI chips2023–todaythe bottleneckNVIDIA's sales to data centres more than tripled in the year to January 2024, while the research firm Omdia estimated waits of most of a year for servers built on its chips. source
Packaging and memory2023–todaythe bottleneckIn July 2023 TSMC said its advanced packaging capacity was very tight; in May 2024 SK Hynix said its fast memory was sold out for that year and almost sold out for the next. source
Public text2022–todayshortIn 2022 DeepMind found large models had been given too little text for their size, and Epoch estimated the stock of high-quality text would run out within a few years, an estimate it later moved to 2028. Neither says text was what held labs back. source
Expert-written data2022–todayshortA 2022 OpenAI paper trained a model on feedback from a few dozen hired contractors; by the middle of 2023 data firms were recruiting people with expertise in law, finance and programming, and in 2025 Meta took a large minority stake in one of them. The sources report the buying, not a shortage. source
Running and routing models2023–2025shortOpenRouter, a marketplace for routing between models, says it started in early 2023. By early 2025 Epoch found the price of a fixed level of performance falling many times over each year, so the price of using a model stopped being what held builders back. source
Practice tasks and graders2025–todayshortIn September 2025 TechCrunch reported the leading labs demanding more simulated tasks in which a model's attempts are graded, and said, citing The Information, that one lab's leaders had discussed spending more than a billion dollars on them within a year. source
Power and data-centre sites2022–todayshortIn July 2022 a Virginia utility began telling data-centre companies that power for some new sites would be delayed for years. In 2024 the United States Department of Energy reported that waits of three years were commonly quoted for large transformers; its report is not about data centres. That power is what holds the build-out back now is this site's prediction, listed below. source
Folio III · the tell

Watch what the labs buy

A new bottleneck tends to satisfy three conditions at once. It limits the labs' next step, not their last one; yesterday's constraint is today's commodity. It has not yet become an industry, so there is no standard product, no quoted price and no public data, which is exactly why it is hard to see from outside. And it shows up first in what the labs buy, because a lab knows what it is short of long before anyone publishes a number about it.

That last condition can be watched. This site keeps two tallies by hand from public announcements. The first counts disclosed purchases by labs from the firms that sell training inputs, scored by how firm the evidence is. It is no higher than a year ago. The second counts labs and large technology companies taking companies in the layers around them, by buying them or by hiring their teams: 46 such deals in the past four quarters. That tally is too young to set against the four quarters before it. Both tallies rise when coverage improves as well as when buying does, so neither is proof of anything on its own, and neither is used here to say that a named input has peaked.

The buying that is visible points at practice. In September 2025 TechCrunch reported that the leading labs were "demanding more" of what the industry calls reinforcement-learning environments: simulated software tasks in which a model's attempts are graded and the grades are used to train it. It said, citing The Information, that the leaders of Anthropic, another of the labs, had discussed spending more than a billion dollars on them within a year. A public directory that this site reads lists 23 firms selling them. A list of sellers is supply responding, though. It shows that the business exists, not that the product is short.

Deals announced by labs and computing companies for the companies around them, by buyer and quarterChart
OpenAI15
Anthropic5
Meta Platforms5
CoreWeave Inc.3
Nebius Group N.V.3
Alphabet Inc.2
Amazon.com Inc.2
Microsoft Corp2
Mistral AI2
Advanced Micro Devices1
Cohere1
Crusoe1
Deepgram1
Poolside1
Rebellions1
Thinking Machines Lab1
All buyers712131446
a deal, in the quarter it was announceda deal its record notes was later called off; it still counts

One mark for each of the 46 deals in this site's tally for the year to its newest searched quarter. A mark is an announcement, not a completed purchase: it may be a purchase, a hire of the team, or a licence or stake that came with the company's leaders, and a deal later called off still counts. The buyers are a mix of companies that train AI models, large technology companies that also do so, and companies that sell computing power. Do not read the totals from left to right as a trend: the tally is kept by hand from public announcements, quiet hires surface late, a quarter with more marks may only have been searched more thoroughly, and a later search can add marks to quarters already drawn. What each bought company does is written only in the notes on each record, so it is not drawn here. The figures on this page were drafted by a Claude model, made by Anthropic, which is one of the buyers drawn.

Every deal counted
BuyerAnnouncedCompany (record id)
OpenAI2 Sep 2025alex_codes
OpenAI2 Sep 2025statsig
OpenAI3 Oct 2025roi
OpenAI23 Oct 2025sky
OpenAI6 Nov 2025jams
OpenAI3 Dec 2025neptune
OpenAI12 Jan 2026torch
OpenAI27 Jan 2026crixet
OpenAI9 Mar 2026promptfoo
OpenAI19 Mar 2026astral
OpenAI7 Apr 2026cirrus_labs
OpenAI13 Apr 2026hiro_finance
OpenAI11 May 2026tomoro
OpenAI22 May 2026weights
OpenAI11 Jun 2026ona
Anthropic13 Aug 2025humanloop
Anthropic3 Dec 2025bun
Anthropic25 Feb 2026vercept
Anthropic24 Apr 2026runhouse
Anthropic18 May 2026stainless
Meta Platforms5 Dec 2025limitless
Meta Platforms29 Dec 2025manus later called off
Meta Platforms5 Mar 2026gizmo
Meta Platforms10 Mar 2026moltbook
Meta Platforms23 Mar 2026dreamer
CoreWeave Inc.3 Sep 2025openpipe
CoreWeave Inc.6 Oct 2025monolith_ai
CoreWeave Inc.30 Oct 2025marimo
Nebius Group N.V.10 Feb 2026tavily
Nebius Group N.V.1 May 2026eigen_ai
Nebius Group N.V.12 May 2026clarifai
Alphabet Inc.11 Jul 2025windsurf
Alphabet Inc.19 Dec 2025producerai
Amazon.com Inc.22 Jul 2025bee
Amazon.com Inc.7 Apr 2026nlx
Microsoft Corp13 Mar 2026fintool
Microsoft Corp17 Mar 2026cove
Mistral AI17 Feb 2026koyeb
Mistral AI19 May 2026emmi_ai
Advanced Micro Devices10 Nov 2025mk1
Cohere19 May 2026reliant_ai
Crusoe21 Aug 2025atero
Deepgram13 Jan 2026ofone
Poolside18 Nov 2025fern_labs
Rebellions30 Jun 2026squeezebits
Thinking Machines Lab13 Apr 2026workshop_labs

Source: Anthropic newsroom; CNBC; TechCrunch; OpenAI research posts; CoreWeave newsroom; AMD blog; Calcalist Ctech; Crusoe newsroom; Emmi AI news; Nicolas Bustamante's blog (Fintool founder); Google blog (The Keyword); Humanloop website; Koyeb blog; Limitless website; Manus blog; Nebius newsroom; Poolside blog; Silicon Republic; Workshop Labs blog; AWS Contact Center Blog; Business Insider; Cirrus Labs website; Jams website; Weights website; BetaKit; Deepgram announcements; Rebellions announcements. Anthropic newsroom. CNBC. TechCrunch. OpenAI. CoreWeave (company announcement). AMD blog. Calcalist Ctech. Crusoe newsroom. Emmi AI news. Nicolas Bustamante's blog (Fintool founder). Google blog (The Keyword). Humanloop website. Koyeb blog. Limitless website. Manus blog. Nebius newsroom. Poolside blog. Silicon Republic. Workshop Labs blog. AWS Contact Center Blog. Business Insider. Cirrus Labs website. Jams website. Weights website. BetaKit. Deepgram (company announcement). Rebellions (company announcement).

Folio IV · the reading

Most of the chain cannot be scored from what this site reads today

The scorecard below splits the making of AI into twenty-three inputs, from minerals to money, and asks of each how hard it is to get. The answer is a tightness score from nought to a hundred, read in five words from slack to severe. Each score is built from a few gauges. A gauge takes one published figure, such as how fast the supply of chip packaging is growing, and converts it to points on a scale set by hand. Beside each score is a confidence, worked out from how much of the intended evidence has a reading, how fresh it is and how good its source is. An input with no usable data is not given a middling score. It is withheld, with the reason. Today 8 of the twenty-three can be scored.

Most of the gauges behind the card read Epoch AI's estimates. One of its datasets follows the largest AI data centres, most of them in the United States, and gives for each a timeline of how much power the site draws or is expected to draw. At the 54 sites where Epoch gives both a built figure and a planned one, the plans add up to 4.47× what stands today. The card reads that as tight, with a caution attached: 20 of those sites have nothing built at all yet, and without them the ratio is 2.32×. Epoch publishes wide error margins for these estimates, so neither figure deserves its second decimal place. And a gap between plans and buildings is what a shortage of builders, equipment and grid connections would produce, but a fast and untroubled build-out would produce it too.

Where the record above and the card disagree, the card is usually measuring something slower. Its gauges for memory and AI chips, when they have a reading young enough to use, read how fast the supply of memory is growing, how much of the chip supply one designer holds, and a long trend in the list prices of chips at launch. Epoch counts memory supply in dollars, so dearer memory looks the same as more memory. A shortage shows up first in what buyers pay today and how long they wait, and this site reads no series of either for these inputs. So the card can read an input as moderate, or withhold it for want of a fresh reading, while the record says it is short. The score for electricity measures demand only: how fast the power drawn by all the AI chips sold so far is growing, which says nothing about how much power can be supplied. Whenever it has a score, that score is drawn hatched, which on the scorecard marks low confidence. Money reads slack: the five largest builders of data centres have raised their spending on buildings and equipment by 93.5% in a year.

Every input on one scale, and the ones that cannot be placed on itChart
  • Data-centre buildings78 · tight
    78 · tight
  • AI chips58 · moderate
    58 · moderate
  • Running models28 · easing
    28 · easing
  • Building frontier models25 · easing
    25 · easing
  • Agents and tool use20 · easing
    20 · easing
  • Capital14 · slack
    14 · slack
Low confidence: a stand-in, kept out of the ranking
  • Electricity generation79 · tight
    79 · tight
  • Chip foundries55 · moderate
    55 · moderate
severetightmoderateeasingslacklow confidenceno score

Each solid mark is an input's tightness score from the scorecard below, tightest first. A hatched mark is a score this site holds with low confidence because its gauge is a stand-in for the thing itself; it is drawn apart and is not ranked with the rest. A hollow mark is an input with no score: it has no place on the scale, so it is drawn beside it, never in the middle. Inputs that sit close together are not in a meaningful order. Each mark links to its row in the scorecard, where the gauges and their sources are.

The scores
InputTightnessReads asConfidence
Data-centre buildings78tight60
AI chips58moderate77
Running models28easing78
Building frontier models25easing69
Agents and tool use20easing50
Capital14slack76
Electricity generation79tight40 (low, not ranked)
Chip foundries55moderate44 (low, not ranked)
Critical mineralsno score
The grid and its hookupsno score
Chip-making equipmentno score
Advanced chip packagingno score
Memoryno score
Networking and opticsno score
Systems softwareno score
Training infrastructureno score
Post-trainingno score
Continual learningno score
Routing between modelsno score
Tests and evaluationsno score
Training datano score
Deployment platformsno score
Applicationsno score
How tight each input to AI is todaynought slack · a hundred severe · scored only where a published series supports it
InputTightnessConfidenceGauges
SupplyTight means the thing itself is hard to get: supply is growing slowly, a few buyers take most of it, or far more is promised than built.
01Critical mineralsNot scored: published, but this site does not read it yet. This site reads no series on how much of these minerals is mined or sold.A model's judgement, not a reading: probably moderate. China's export controls on gallium, germanium and rare earths have made supply uncertain and dearer, and copper is expensive, but chip and power-equipment makers have so far kept buying what they need. No AI build is known to have stalled for want of a raw material. The strongest point the other way is that the controls can be turned up at short notice and rare-earth magnets were briefly short in 2025.
02Electricity generationconfidence 40 (low) · 1 of 1 gaugeDemand only: how fast the electricity that all AI chips sold so far would draw is growing. It says nothing about how much power can be supplied.
79 · tight
40 (low)1 of 1
03The grid and its hookupsNot scored: nobody publishes a series that would measure it. The wait to connect a large new load, such as a data centre, is what scarcity here would show up in. Only one utility has stated its wait, and only through local press, so there is no series to read.A model's judgement, not a reading: probably tight. Waits for large transformers and switchgear run to several years and the queues to connect a big new load are long in the main data-centre regions, which is why builders increasingly put gas turbines on site. It sits beside data-centre buildings on the site's scale and may well deserve the top word. Against that, on-site power and flexible-connection deals let determined builders route round the wire.
04Data-centre buildingsconfidence 60 · 1 of 2 gaugesThe power Epoch expects at the large sites it tracks, against the power it counts as built there today.
78 · tight
601 of 2
05Chip-making equipmentNot scored: the gauge available does not measure what it claims. This site reads the equipment makers' filings, but their backlogs do not measure demand from AI: one of the largest files no backlog, and the others' backlogs fell while the AI build-out grew, following the wider chip cycle.A model's judgement, not a reading: probably moderate. Lithography and other tools are sold by very few firms with long lead times, but foundries, which the site reads as moderate, have been able to buy the machines their expansion plans call for. A memory spending upturn in 2026 has pulled orders up. The strongest point the other way is that the most advanced lithography machines are built in small numbers and cannot be hurried.
06Chip foundriesconfidence 44 (low) · 1 of 2 gaugesHow fast the supply of leading-edge logic wafers is growing, year on year.
55 · moderate
44 (low)1 of 2
07Advanced chip packagingNot scored: its readings are too old or too few today. None of its gauges has a usable reading today: each is missing or older than its age limit.
08MemoryNot scored: its readings are too old or too few today. None of its gauges has a usable reading today: each is missing or older than its age limit.
09AI chipsconfidence 77 · 3 of 3 gaugesHow much of the chip supply one designer holds, and whether the cost of a unit of computing power is still falling.
58 · moderate
773 of 3
10Networking and opticsNot scored: published, but this site does not read it yet. This site reads no series on networking gear for AI clusters.A model's judgement, not a reading: probably moderate. Switches and copper cabling are available, but optical transceivers and the lasers inside them have been reported short as clusters grow, with suppliers adding capacity. This slows some deliveries without being what decides whether a cluster gets built. It could be a step tighter than this, since optics makers have spoken of demand running ahead of supply.
12Training infrastructureNot scored: the gauge available does not measure what it claims. Epoch lists how fully some training runs used their chips, but almost none are the largest runs this input is about, since the labs running them publish nothing, and the figures are measured against different chip speeds, so the same skill can read as twice as tight.A model's judgement, not a reading: probably moderate. Running one training job across a very large cluster without wasting it is a skill held by a small number of teams, and newcomers have struggled with failures and idle chips. Yet several labs now do it routinely and the know-how spreads as people move. The labs publish nothing on this, so the judgement could be out by a step either way.
16Running modelsconfidence 78 · 2 of 3 gaugesThe price, in dollars for a million tokens of output, of the cheapest model among a named basket of flagship models on one marketplace. A token is a word or a piece of one. One vendor sets it.
28 · easing
at the end of its scale
782 of 3
20Training dataNot scored: nobody publishes a series that would measure it. Sellers' revenues, which this site tracks from press reports, show activity. Nobody publishes prices or waiting times, which are what scarcity would show up in.A model's judgement, not a reading: probably moderate. Paid expert data has become a large business with fast-growing sellers, which shows supply responding to demand. Scarce specialists in fields such as medicine, law and advanced science remain hard to recruit in quantity, and licensed archives are finite. Without prices or waiting times the call could be a step too tight or too loose.
21Deployment platformsNot scored: nobody publishes a series that would measure it. No public series separates these platforms' capacity from the cost of running models, which the row for running models reads.A model's judgement, not a reading: probably easing. Hosting a model for another business is offered by the large clouds and many specialist firms, and prices for serving a given quality of model have kept falling, in line with the site's reading for running models. The strongest point the other way is that popular models still hit usage limits at busy times, which suggests serving capacity is not as loose as prices imply.
Know-howTight means few people or firms can do it well yet, so skill rather than material is what is short.
11Systems softwareNot scored: published, but this site does not read it yet. The activity of the open-source projects is public, but this site does not read it, and more activity could mean either a shortage being fixed or none at all.A model's judgement, not a reading: probably easing. The hold of one vendor's software stack was a real obstacle to using other chips, but Google's and Amazon's own chips now train and serve frontier models at scale, AMD's are in use for serving at several large buyers, and the common frameworks hide much of the difference. The strongest point the other way is that porting and tuning for a new chip still takes scarce specialist engineers and months of work.
13Building frontier modelsconfidence 69 · 1 of 1 gauge
25 · easing
691 of 1
14Post-trainingNot scored: nobody publishes a series that would measure it. Nobody publishes what this work costs or how long buyers wait for it. This site counts the sellers and keeps a tally of disclosed deals, which says the business exists, not whether it is short.A model's judgement, not a reading: probably moderate. Demand for practice environments with automatic graders and for expert feedback grew sharply through 2025 and 2026, and labs say good environments are hard to buy. Many new sellers have entered, which keeps quantity available. The strongest point the other way is that quality, not quantity, is what is short, and badly graded tasks teach models the wrong thing.
15Continual learningNot scored: nobody publishes a series that would measure it. No public test measures whether a model keeps learning after release. This site tracks what vendors claim, which is not a measure of scarcity.A model's judgement, not a reading: probably tight. This is an unsolved research problem and not a supply that has run short: nothing is sold out, the method simply does not yet exist in dependable form. No widely used model keeps learning from its own use, and memory features and longer context are workarounds. The word here means the gap slows those building agents meant to improve on the job, as researchers and lab leaders commonly say. Against that, products ship and sell without it, so as a brake today it may only be moderate.
17Routing between modelsNot scored: the gauge available does not measure what it claims. The spread of list prices is set almost entirely by one very expensive model, so it says nothing dependable about how much a router can save.A model's judgement, not a reading: probably slack. Routing services are numerous, cheap to build and easy to switch between, and the large cloud platforms offer the same function. Nothing suggests a builder is held up for lack of one. The strongest point the other way is that choosing well between models for hard tasks is still crude, but that is a quality problem and not a shortage.
18Tests and evaluationsNot scored: nobody publishes a series that would measure it. This site holds many benchmark scores, but none of them measures whether good testing is itself in short supply.A model's judgement, not a reading: probably moderate. This is a gap in tooling and method, not a supply that has run short: benchmarks and testing firms are numerous, and what is lacking is tests that can be trusted. Benchmarks saturate soon after release, tests of long tasks are costly to build and score, and independent testers cannot cover each new model fully before launch. Yet releases have not visibly slowed for want of measurement, which is why this sits at moderate and not higher. The strongest point the other way is that buyers and labs alike say they lack trustworthy measures of real-world performance, so it could be a step tighter.
19Agents and tool useconfidence 50 · 1 of 2 gauges
20 · easing
501 of 2
MoneyTight means money is hard to raise. Slack means it is plentiful, which is not the same as well spent.
22ApplicationsNot scored: nobody publishes a series that would measure it. Most of these companies are private, and too few publish their finances to say how hard money is for them to raise.A model's judgement, not a reading: probably slack. Money for AI applications has been plentiful, with large rounds at high valuations for coding, legal, medical and customer-service products, consistent with the site's reading that capital is slack. The strongest point the other way is that funding concentrates in a few leaders, and many smaller application firms face thin margins because they pay model makers for each use.
23Capitalconfidence 76 · 1 of 1 gaugeHow fast Microsoft, Alphabet, Amazon, Meta and Oracle are raising their spending on buildings and equipment, over the past four quarters against the four before.
14 · slack
761 of 1
slackeasingmoderatetightsevereconfidence under 45

Tightness is this site's arithmetic on other people's figures, most of them Epoch AI's estimates, for which Epoch publishes wide error margins. A gap of under ten points between two inputs means nothing. How the scores are made.

Source: METR time horizons (v1.1); SEC EDGAR XBRL company facts; OpenRouter model prices; Epoch AI notable and frontier models; Epoch AI ML hardware; Epoch AI chip sales; Epoch AI data centres; Earnings-call transcripts (The Motley Fool); GetDeploying GPU rental price history (weekly median on-demand price per GPU-hour). METR, Measuring AI Ability to Complete Long Tasks (Horizon v1.1). SEC EDGAR, XBRL company facts API. OpenRouter list prices. Epoch AI, Notable AI Models (CC BY 4.0). Epoch AI, Machine Learning Hardware (CC BY 4.0). Epoch AI, AI Chip Sales (CC BY 4.0). Epoch AI, AI Data Centers (CC BY 4.0). The Motley Fool's transcripts of company earnings calls. GetDeploying, GPU rental price history (CC BY 4.0).

The gauges behind each score
GaugeReadingPointsWeightAge, of limitGrade
Electricity generation · evidence fed 0.55, freshness 0.51, source 0.75
Growth in the power drawn by AI chips sold122.5%790.55218 of 300 daysgrade C
Data-centre buildings · evidence fed 0.6, freshness 0.99, source 0.75
Planned power against built power4.47×780.61 of 120 daysgrade C
Growth in built powerno gauge here—0.25——
Chip foundries · evidence fed 0.4, freshness 0.43, source 0.5
Growth in leading-edge logic supply29.7%—0.42308 of 300 daysgrade C
Growth TSMC states for its newest node70.0%550.4111 of 120 daysgrade D
AI chips · evidence fed 0.75, freshness 0.69, source 0.85
How concentrated chip supply is by designer0.48 index430.25127 of 300 daysgrade C
Yearly change in the cost of computing power-17.3%480.294 of 300 daysgrade B
Yearly change in the rent for NVIDIA's most-rented AI chip29.2%760.39 of 21 daysgrade B
Building frontier models · evidence fed 0.6, freshness 0.75, source 0.75
How fast the computing power behind frontier models doubles170 days250.4562 of 200 daysgrade C
Running models · evidence fed 0.6, freshness 0.92, source 0.9
Cheapest model in the basket$0.38120.450 of 7 daysgrade B
Change in that price over a monthno gauge here—0.25——
Yearly change in the rent for NVIDIA's most-rented AI chip29.2%760.159 of 21 daysgrade B
Agents and tool use · evidence fed 0.4, freshness 0.47, source 1
How fast the length of task an agent can finish doubles108 days200.4244 of 300 daysgrade A
Share of models that can use toolsno gauge here—0.2——
Capital · evidence fed 0.59, freshness 0.85, source 0.9
Growth in the largest builders' spending93.5%140.535 of 200 daysgrade B
How old each reading is, against the age at which it stops countingChart

Inputs with a score today: 8. Still scored if every reading near its limit lapsed with nothing newer: 7.

Electricity generation79 · tight today
Growth in the power drawn by AI chips sold
218 of 300 days
Data-centre buildings78 · tight today
Planned power against built power
1 of 120 days
Chip foundries55 · moderate todayscore would be withheld
Growth TSMC states for its newest node
counts until 13 Nov 2026
AI chips58 · moderate today
How concentrated chip supply is by designer
127 of 300 days
Yearly change in the cost of computing power
94 of 300 days
Yearly change in the rent for NVIDIA's most-rented AI chip
9 of 21 days
Building frontier models25 · easing today
How fast the computing power behind frontier models doubles
62 of 200 days
Running models28 · easing today
Cheapest model in the basket
0 of 7 days
Yearly change in the rent for NVIDIA's most-rented AI chip
9 of 21 days
Agents and tool use20 · easing today
How fast the length of task an agent can finish doubles
244 of 300 days
Capital14 · slack today
Growth in the largest builders' spending
35 of 200 days
a reading's age, as a share of its limitnear its limit: little of it leftpast this fainter line, a reading is near its limitthe limit: older than this, the reading is dropped

Every bar is one gauge behind a score, as long as its newest reading is old; the right edge is that gauge's own age limit, which differs from gauge to gauge. A dark bar has little of its limit left. A newer reading from the publisher sends the bar back to the left. The note beside an input says what the same scoring rule gives if the dark readings lapse with nothing newer: arithmetic on today's records, not a forecast, and it does not say whether a newer reading is due. Where the note shows a higher score, that is only because a gauge drops out and the rest are left to speak alone; nothing has got tighter. Prices fetched daily have short limits, are refreshed each night, and are aged from the last fetch.

The ages
InputGaugeReading datedAge, of limitCounts until
Electricity generationGrowth in the power drawn by AI chips sold31 Mar 2026218 of 300 days25 Jan 2027
Data-centre buildingsPlanned power against built power3 Nov 20261 of 120 days3 Mar 2027
Chip foundriesGrowth TSMC states for its newest node16 Jul 2026111 of 120 days13 Nov 2026
AI chipsHow concentrated chip supply is by designer30 Jun 2026127 of 300 days26 Apr 2027
AI chipsYearly change in the cost of computing power2 Aug 202694 of 300 days29 May 2027
AI chipsYearly change in the rent for NVIDIA's most-rented AI chip26 Oct 20269 of 21 days16 Nov 2026
Building frontier modelsHow fast the computing power behind frontier models doubles3 Sep 202662 of 200 days22 Mar 2027
Running modelsCheapest model in the basket30 Oct 20260 of 7 days11 Nov 2026
Running modelsYearly change in the rent for NVIDIA's most-rented AI chip26 Oct 20269 of 21 days16 Nov 2026
Agents and tool useHow fast the length of task an agent can finish doubles5 Mar 2026244 of 300 days30 Dec 2026
CapitalGrowth in the largest builders' spending30 Sep 202635 of 200 days18 Apr 2027
Folio V · the blind spots

What nobody publishes is a list of where it may go next

Go back to the second condition. An input that has not yet become an industry has no quoted price and no public data. So the inputs this site cannot score because nobody publishes a series that would measure them are, as a group, candidates for the next bottleneck. They include the work done on a model after its first training, the expert-written data and practice tasks that work consumes, and the testing that says whether any of it helped. This is a conjecture, and it is stated as one. An absence of data is sometimes only an absence.

The same caution applies to the readings behind the scores. In Epoch's newest complete quarter, memory supply grew by 52.8% (as of 2025-12-31) in a year, in dollars, which could mean far more memory or the same memory at a higher price. The grid is invisible from its supply side: this site reads what AI chips would draw, and nothing about what power stations and transmission lines can deliver. In both cases the fix is a better series, not a stronger opinion.

Why each unscored input has no scoreChart, with one judgement marked
7of 15 unscored
nobody publishes a series that would measure it
conjecture: candidates for the next bottleneck
3of 15 unscored
published, but this site does not read it yet
3of 15 unscored
the gauge available does not measure what it claims
2of 15 unscored
its readings are too old or too few today
an input with no scorethis site's conjecture: where the shortage may go next

The groups and their counts are the scorecard's own reasons for withholding a score. Reading one group as candidates for the next bottleneck is this site's conjecture, hatched and labelled where it is drawn: an input nobody publishes a series for may be short, or may only be unmeasured. Each name links to its row in the scorecard.

Each reason in full
InputWhy it has no score
The grid and its hookupsnobody publishes a series that would measure it. The wait to connect a large new load, such as a data centre, is what scarcity here would show up in. Only one utility has stated its wait, and only through local press, so there is no series to read.
Post-trainingnobody publishes a series that would measure it. Nobody publishes what this work costs or how long buyers wait for it. This site counts the sellers and keeps a tally of disclosed deals, which says the business exists, not whether it is short.
Continual learningnobody publishes a series that would measure it. No public test measures whether a model keeps learning after release. This site tracks what vendors claim, which is not a measure of scarcity.
Tests and evaluationsnobody publishes a series that would measure it. This site holds many benchmark scores, but none of them measures whether good testing is itself in short supply.
Training datanobody publishes a series that would measure it. Sellers' revenues, which this site tracks from press reports, show activity. Nobody publishes prices or waiting times, which are what scarcity would show up in.
Deployment platformsnobody publishes a series that would measure it. No public series separates these platforms' capacity from the cost of running models, which the row for running models reads.
Applicationsnobody publishes a series that would measure it. Most of these companies are private, and too few publish their finances to say how hard money is for them to raise.
Critical mineralspublished, but this site does not read it yet. This site reads no series on how much of these minerals is mined or sold.
Networking and opticspublished, but this site does not read it yet. This site reads no series on networking gear for AI clusters.
Systems softwarepublished, but this site does not read it yet. The activity of the open-source projects is public, but this site does not read it, and more activity could mean either a shortage being fixed or none at all.
Chip-making equipmentthe gauge available does not measure what it claims. This site reads the equipment makers' filings, but their backlogs do not measure demand from AI: one of the largest files no backlog, and the others' backlogs fell while the AI build-out grew, following the wider chip cycle.
Training infrastructurethe gauge available does not measure what it claims. Epoch lists how fully some training runs used their chips, but almost none are the largest runs this input is about, since the labs running them publish nothing, and the figures are measured against different chip speeds, so the same skill can read as twice as tight.
Routing between modelsthe gauge available does not measure what it claims. The spread of list prices is set almost entirely by one very expensive model, so it says nothing dependable about how much a router can save.
Advanced chip packagingits readings are too old or too few today. None of its gauges has a usable reading today: each is missing or older than its age limit.
Memoryits readings are too old or too few today. None of its gauges has a usable reading today: each is missing or older than its age limit.
Folio VI · the predictions

What binds now, what binds next, and what would prove each wrong

Three cautions belong with any list like the one below. Rent from a bottleneck is temporary by construction, so every entry on it expires. The revenue figures quoted for the firms that sell training data are gross, not net: they count the pay that goes on to the people doing the work. And one risk sits under all of it. The largest builders are spending 4.38× as much on buildings and equipment as the AI revenue this site can measure. If that spending stopped, every input on this page would loosen at once, and the question of which was tightest would stop mattering for a while.

With that said, here is what this site expects, and what would show it to be wrong. Each entry is tested every night where a test exists. Where none does, the entry says what outcome would settle it.

The predictions, re-tested every night

These are this site's own calls. The predictions ledger is a different thing: it scores what other people have forecast.

  • Data-centre buildings and their power hookups are the bottleneck.

    Epoch expects more than twice the built power at the sites it tracks: 4.47× today. Proved wrong if that ratio falls below two while at least twenty sites still compare. Only Epoch's revisions can take it below two, by raising what it counts as built or by cutting what it expects. The calendar moves it as well, because a milestone Epoch projected counts as built once its date passes, whether or not Epoch has confirmed it, and a site with no later milestone leaves the count. A fast, untroubled build-out would read the same as a shortage, so this is a weak test of a strong claim.

    Nowholding so far
  • Money is not what is scarce.

    The five largest builders of data centres are still raising their spending by more than a fifth a year: 93.5%. Proved wrong if that growth falls below a fifth, the halfway point on this site's scale for money: below it the reading leans towards scarce.

    Nowholding so far
  • Memory and chip packaging are short.

    This cannot be tested yet. Memory supply is published in dollars, so a price rise and a volume rise look the same, and packaging supply is published without any measure of demand. It would be proved wrong if memory supply counted in units grew faster than chip shipments for two quarters running.

    Nowcan't be tested yet
  • Practice tasks with automatic graders, and the expert-written data they consume, are where the shortage goes next.

    The test is whether the labs' disclosed buying from the firms that sell these inputs is rising on a year before. It is not, so this prediction is failing its test today. The tally is kept by hand from public announcements, and most such buying is never announced, so the test undercounts. It is still the only one available.

    Nextfailing its test
  • Proof of what an AI agent (a model that carries out tasks with software tools on a person's behalf) did, and who answers for it, becomes a bottleneck once agents handle money.

    This cannot be tested yet, because no public series exists. In April 2025 Mastercard and Visa each announced a system for verifying an AI agent before it pays on a person's behalf. The prediction would be proved wrong if the card networks' own systems come to cover this before any specialist firm sells it to a lab or a large company.

    Watchcan't be tested yet

Sources

  1. Eliyahu M. Goldratt, The Five Steps of Focusing, North River Press, adapted from What Is This Thing Called Theory of Constraints, 1990; The Goal, written with Jeff Cox, was first published in 1984.
  2. David Ricardo, On the Principles of Political Economy, and Taxation, John Murray, London, 1817, chapter two, On Rent.
  3. Alex Krizhevsky, Ilya Sutskever and Geoffrey Hinton, ImageNet Classification with Deep Convolutional Neural Networks, Advances in Neural Information Processing Systems, 2012.
  4. Antonio Regalado, Is Google Cornering the Market on Deep Learning?, MIT Technology Review, January 2014.
  5. Jared Kaplan and colleagues, Scaling Laws for Neural Language Models, arXiv, January 2020.
  6. NVIDIA, Financial results for the fourth quarter and fiscal 2024, press release, February 2024.
  7. Anton Shilov, Nvidia sold half a million H100 AI GPUs in Q3 thanks to Meta, Facebook: lead times stretch up to 52 weeks, Tom's Hardware, November 2023, reporting the research firm Omdia's estimate.
  8. TSMC, Second-quarter 2023 earnings call transcript, July 2023.
  9. Kim Boram, SK hynix to mass-produce industry-leading 12H HBM for AI chip leadership: CEO, Yonhap News Agency, May 2024.
  10. Jordan Hoffmann and colleagues, Training Compute-Optimal Large Language Models, arXiv, 2022.
  11. Pablo Villalobos and colleagues, Will we run out of data?, arXiv, first version, 2022.
  12. Pablo Villalobos and colleagues, Will we run out of data? Limits of LLM scaling based on human-generated data, Epoch AI, June 2024.
  13. Long Ouyang and colleagues, Training language models to follow instructions with human feedback, arXiv, 2022.
  14. Josh Dzieza, AI Is a Lot of Work, The Verge, June 2023.
  15. Ben Cottier, Ben Snodin, David Owen and Tom Adamczewski, LLM inference prices have fallen rapidly but unequally across tasks, Epoch AI data insight, March 2025.
  16. OpenRouter, OpenRouter is joining Stripe, company announcement, August 2026.
  17. Stripe, Stripe agrees to acquire OpenRouter, newsroom, August 2026.
  18. Rich Miller, Dominion Resumes New Connections, But Loudoun Faces Lengthy Power Constraints, Data Center Frontier, September 2022.
  19. United States Department of Energy, Large Power Transformer Resilience, report to Congress, July 2024.
  20. International Energy Agency, Energy and AI, April 2025.
  21. Maxwell Zeff, Silicon Valley bets big on environments to train AI agents, TechCrunch, September 2025.
  22. Mastercard, Mastercard unveils Agent Pay, press release, April 2025.
  23. Visa, Find and Buy with AI: Visa Unveils New Era of Commerce, press release, April 2025.
  24. Epoch AI, AI Data Centers, database and its notes on accuracy and coverage.
  25. Epoch AI, Data on AI Chip Components, database.