Skip to content
Slow Variables
Ask
Census · Supply chain · occupation code 43-5061

Production, Planning, and Expediting Clerks

Every task in this role, whether it passes the census's structural hand-over screen, which models pass it, and why. It is a screen, not a claim about what AI can do: a task can pass and still be beyond the systems of the day. The stricter and looser rules re-vote every task, and small differences between roles are noise.

Passes the screen · 6 of 17 tasks

  • Distribute production schedules or work orders to departments.

    quick to check, an existing check settles it, and a mistake is cheap · 10.1% of the role's time · $2.3B · passed by Claude Sonnet, GPT-6 Sol · the models disagreed

  • Compile information, such as production rates and progress, materials inventories, materials used, or customer information, so that status reports can be completed.

    quick to check, an existing check settles it, and a mistake is cheap · 6.3% of the role's time · $1.5B · all three pass it

  • Record production data, including volume produced, consumption of raw materials, or quality control measures.

    quick to check, an existing check settles it, and a mistake is cheap · 4.5% of the role's time · $1.0B · all three pass it

  • Maintain files, such as maintenance records, bills of lading, or cost reports.

    quick to check, an existing check settles it, and a mistake is cheap · 3.9% of the role's time · $905M · all three pass it

  • Calculate figures, such as required amounts of labor or materials, manufacturing costs, or wages, using pricing schedules, adding machines, calculators, or computers.

    quick to check, an existing check settles it, and a mistake is cheap · 3.9% of the role's time · $903M · passed by Claude Sonnet, Gemini 3.1 Pro · the models disagreed

  • Contact suppliers to verify shipment details.

    quick to check, an existing check settles it, and a mistake is cheap · 3.4% of the role's time · $794M · passed by Claude Sonnet, GPT-6 Sol · the models disagreed

Does not pass

  • Confer with department supervisors or other personnel to assess progress and discuss needed changes.

    reason given most often: no existing check settles it · 9.4% of the role's time · $2.2B

  • Arrange for delivery, assembly, or distribution of supplies or parts to expedite flow of materials and meet production schedules.

    reason given most often: nobody can tell quickly whether it worked · 9.1% of the role's time · $2.1B

  • Revise production schedules when required due to design changes, labor or material shortages, backlogs, or other interruptions, collaborating with management, marketing, sales, production, or engineering.

    reason given most often: nobody can tell quickly whether it worked, and no existing check settles it · 8.1% of the role's time · $1.9B

  • Review documents, such as production schedules, work orders, or staffing tables, to determine personnel or materials requirements or material priorities.

    reason given most often: no existing check settles it · 7.4% of the role's time · $1.7B · waiting on a check

  • Confer with establishment personnel, vendors, or customers to coordinate production or shipping activities and to resolve complaints or eliminate delays.

    reason given most often: nobody can tell quickly whether it worked, and no existing check settles it · 7.3% of the role's time · $1.7B

  • Requisition and maintain inventories of materials or supplies necessary to meet production demands.

    reason given most often: nobody can tell quickly whether it worked · 7.3% of the role's time · $1.7B · passed by Claude Sonnet · the models disagreed

  • Plan production commitments or timetables for business units, specific programs, or jobs, using sales forecasts.

    reason given most often: nobody can tell quickly whether it worked, and no existing check settles it, and a failure is too expensive · 6.3% of the role's time · $1.4B

  • Examine documents, materials, or products and monitor work processes to assess completeness, accuracy, and conformance to standards and specifications.

    physical work, outside the screen · 4.7% of the role's time · $1.1B

  • Compile and prepare documentation related to production sequences, transportation, personnel schedules, or purchase, maintenance, or repair orders.

    reason given most often: no existing check settles it · 4.6% of the role's time · $1.1B · passed by Claude Sonnet · the models disagreed · waiting on a check

  • Establish and prepare product construction directions and locations and information on required tools, materials, equipment, numbers of workers needed, and cost projections.

    reason given most often: nobody can tell quickly whether it worked, and no existing check settles it · 2.3% of the role's time · $542M

  • Provide documentation and information to account for delays, difficulties, or changes to cost estimates.

    reason given most often: no existing check settles it · 1.5% of the role's time · $337M · waiting on a check

Where this role works