Civil Engineering Technologists and Technicians
Every task in this role, whether it passes the census's structural hand-over screen, which models pass it, and why. It is a screen, not a claim about what AI can do: a task can pass and still be beyond the systems of the day. The stricter and looser rules re-vote every task, and small differences between roles are noise.
Passes the screen · 0 of 14 tasks
No task in this role passes the screen.
Does not pass
Calculate dimensions, square footage, profile and component specifications, and material quantities, using calculator or computer.
reason given most often: a failure is too expensive · 12.9% of the role's time · $541M · passed by Claude Sonnet · the models disagreed
Draft detailed dimensional drawings and design layouts for projects to ensure conformance to specifications.
reason given most often: no existing check settles it · 12.3% of the role's time · $517M
Read and review project blueprints and structural specifications to determine dimensions of structure or system and material requirements.
reason given most often: no existing check settles it, and a failure is too expensive · 10.7% of the role's time · $450M · passed by Claude Sonnet · the models disagreed
Prepare reports and document project activities and data.
reason given most often: no existing check settles it · 9.4% of the role's time · $395M · waiting on a check
Confer with supervisor to determine project details such as plan preparation, acceptance testing, and evaluation of field conditions.
reason given most often: no existing check settles it · 8.5% of the role's time · $356M · waiting on a check
Inspect project site and evaluate contractor work to detect design malfunctions and ensure conformance to design specifications and applicable codes.
physical work, outside the screen · 8.2% of the role's time · $343M
Analyze proposed site factors and design maps, graphs, tracings, and diagrams to illustrate findings.
reason given most often: no existing check settles it · 7.9% of the role's time · $331M · waiting on a check
Develop plans and estimate costs for installation of systems, utilization of facilities, or construction of structures.
reason given most often: nobody can tell quickly whether it worked, and no existing check settles it · 6.9% of the role's time · $288M
Conduct materials test and analysis, using tools and equipment and applying engineering knowledge.
physical work, outside the screen · 6.4% of the role's time · $267M
Plan and conduct field surveys to locate new sites and analyze details of project sites.
physical work, outside the screen · 5.5% of the role's time · $232M
Respond to public suggestions and complaints.
reason given most often: nobody can tell quickly whether it worked, and no existing check settles it · 4.1% of the role's time · $171M
Report maintenance problems occurring at project site to supervisor and negotiate changes to resolve system conflicts.
reason given most often: nobody can tell quickly whether it worked, and no existing check settles it · 3.4% of the role's time · $143M
Develop project budgets by estimating the cost of project activities.
reason given most often: nobody can tell quickly whether it worked, and no existing check settles it · 2.6% of the role's time · $110M
Negotiate with contractors on prices for new contracts or modifications to existing contracts.
reason given most often: nobody can tell quickly whether it worked, and no existing check settles it, and a failure is too expensive · 1.3% of the role's time · $52.6M
Where this role works
| Industry | Workers | Wage bill | Passes the screen | All three pass |
|---|---|---|---|---|
| Architectural, Engineering, and Related Services | 30,530 | $2.1B | $0 | $0 |
| Local Government, excluding Schools and Hospitals (OEWS Designation) | 12,650 | $934M | $0 | $0 |
| State Government, excluding Schools and Hospitals (OEWS Designation) | 13,480 | $844M | $0 | $0 |
| Nonresidential Building Construction | 1030 | $64.7M | $0 | $0 |
| Management, Scientific, and Technical Consulting Services | 830 | $48.7M | $0 | $0 |
| Colleges, Universities, and Professional Schools | 470 | $32.1M | $0 | $0 |
| Employment Services | 360 | $21.7M | $0 | $0 |
| Scientific Research and Development Services | 240 | $18.8M | $0 | $0 |
| Utility System Construction | 250 | $14.0M | $0 | $0 |
| Management of Companies and Enterprises | 130 | $9.9M | $0 | $0 |