Chemical Engineers
Every task in this role, whether it passes the census's structural hand-over screen, which models pass it, and why. It is a screen, not a claim about what AI can do: a task can pass and still be beyond the systems of the day. The stricter and looser rules re-vote every task, and small differences between roles are noise.
Passes the screen · 0 of 14 tasks
No task in this role passes the screen.
Does not pass
Monitor and analyze data from processes and experiments.
reason given most often: no existing check settles it · 19.5% of the role's time · $432M
Troubleshoot problems with chemical manufacturing processes.
physical work, outside the screen · 12.0% of the role's time · $265M
Evaluate chemical equipment and processes to identify ways to optimize performance or to ensure compliance with safety and environmental regulations.
physical work, outside the screen · 11.7% of the role's time · $258M
Perform tests and monitor performance of processes throughout stages of production to determine degree of control over variables such as temperature, density, specific gravity, and pressure.
physical work, outside the screen · 10.6% of the role's time · $236M
Conduct research to develop new and improved chemical manufacturing processes.
reason given most often: nobody can tell quickly whether it worked, and no existing check settles it, and a failure is too expensive · 7.1% of the role's time · $158M
Develop safety procedures to be employed by workers operating equipment or working in close proximity to ongoing chemical reactions.
reason given most often: nobody can tell quickly whether it worked, and no existing check settles it, and a failure is too expensive · 6.8% of the role's time · $151M
Prepare estimate of production costs and production progress reports for management.
reason given most often: nobody can tell quickly whether it worked, and no existing check settles it · 5.2% of the role's time · $115M
Direct activities of workers who operate or are engaged in constructing and improving absorption, evaporation, or electromagnetic equipment.
reason given most often: nobody can tell quickly whether it worked, and no existing check settles it · 4.7% of the role's time · $104M
Design and plan layout of equipment.
reason given most often: nobody can tell quickly whether it worked, and no existing check settles it, and a failure is too expensive · 4.6% of the role's time · $101M
Develop computer models of chemical processes.
reason given most often: nobody can tell quickly whether it worked, and no existing check settles it · 4.1% of the role's time · $91.3M
Develop processes to separate components of liquids or gases or generate electrical currents, using controlled chemical processes.
reason given most often: nobody can tell quickly whether it worked, and no existing check settles it, and a failure is too expensive · 3.7% of the role's time · $81.8M
Perform laboratory studies of steps in manufacture of new products and test proposed processes in small-scale operation, such as a pilot plant.
physical work, outside the screen · 3.7% of the role's time · $81.7M
Determine most effective arrangement of operations such as mixing, crushing, heat transfer, distillation, and drying.
reason given most often: nobody can tell quickly whether it worked, and no existing check settles it · 3.6% of the role's time · $79.9M
Design measurement and control systems for chemical plants based on data collected in laboratory experiments and in pilot plant operations.
reason given most often: nobody can tell quickly whether it worked, and no existing check settles it, and a failure is too expensive · 2.8% of the role's time · $61.8M
Where this role works
| Industry | Workers | Wage bill | Passes the screen | All three pass |
|---|---|---|---|---|
| Chemical Manufacturing (3251, 3252, 3253, and 3259 only) | 4720 | $569M | $0 | $0 |
| Architectural, Engineering, and Related Services | 2580 | $342M | $0 | $0 |
| Scientific Research and Development Services | 2140 | $270M | $0 | $0 |
| Management of Companies and Enterprises | 1300 | $190M | $0 | $0 |
| Petroleum and Coal Products Manufacturing | 1160 | $166M | $0 | $0 |
| Federal Executive Branch (OEWS Designation) | 910 | $120M | $0 | $0 |
| Pharmaceutical and Medicine Manufacturing | 840 | $98.4M | $0 | $0 |
| Merchant Wholesalers, Nondurable Goods (4242 and 4246 only) | 550 | $66.6M | $0 | $0 |
| Chemical Manufacturing (3255 and 3256 only) | 350 | $39.1M | $0 | $0 |
| Semiconductor and Other Electronic Component Manufacturing | 310 | $36.7M | $0 | $0 |